NEW QUESTION # 37
Where are Capabilities managed?
- A. In the Value Stream planning board.
- B. In the Value Stream Kanban.
- C. In the ART Kanban.
- D. In the Portfolio Kanban.
Answer: B
NEW QUESTION # 38
A change agent is invited to help an ART where management requires the teams to make big, up-front, and detailed scope commitments for every release. These commitments are not mandated by the external environment. What can the change agent do to best coach the decision makers?
- A. Explain that too much up-front detail demotivates Product Owners
- B. Explain the benefits of releasing at the end of the PI
- C. Explain the need to satisfy the commitments immediately and improve later
- D. Explain the value of assuming variability; preserving options
Answer: D
Explanation:
SAFe Principle #3, "Assume variability; preserve options," addresses this scenario directly. The change agent should coach decision makers on the value of maintaining flexibility in scope and design, rather than committing up-front to detailed plans. This principle helps reduce risk and ensures better outcomes as new information emerges.
References:
SAFe 6.0, "SAFe Principles" (Principle #3)
SPC 6.0 Guide, "Leading the Change" and "Coaching Change Agents"
NEW QUESTION # 39
What is Cost of Delay?
- A. Penalty for nonperformance.
- B. Cost of not addressing risk early on.
- C. Opportunity cost and deferred revenue.
- D. Cost incurred when system integration appears too late in the PI.
Answer: C
Explanation:
Cost of Delay is the economic impact of delaying or deferring work. It combines opportunity cost and potential revenue lost due to not delivering value sooner. It is a key metric for prioritizing work in SAFe.
References:
SAFe 6.0 Website: WSJF and Cost of Delay
NEW QUESTION # 40
What does the SAFe budgeting model suggest?
- A. Each team gets budget allocation and Features are funded according to their size in normalized Story points.
- B. Each Value Stream receives budget allocation as a whole; individual work is not specifically budgeted.
- C. Epics, Features, and Stories are funded based on their size in normalized Story points, while teams are
allocated to high-priority work as needed. - D. Each Strategic Theme receives a budget allocation when Strategic Themes span portfolios.
Answer: B
NEW QUESTION # 41
Why is capacity allocation important in SAFe?
- A. So that the team is able to meet its Iteration Goals.
- B. So that the work can be better estimated.
- C. It helps resolve conflicts between Feature teams and component teams.
- D. So that team members collaborate better.
- E. So that teams continuously invest in the Architectural Runway.
Answer: E
Explanation:
Capacity allocation in SAFe is the explicit allocation of a portion of backlog capacity to Enablers, which include activities like building or maintaining the Architectural Runway. This ensures that teams continuously invest in infrastructure and architectural work needed for sustainable development, rather than focusing solely on immediate feature delivery.
"Capacity allocation ensures that a portion of team and ART resources is always dedicated to Enabler work, such as building the Architectural Runway, allowing the enterprise to invest in future capabilities while delivering current value." (Source: SAFe 6.0 Framework: Capacity Allocation; SPC 6.0 Guide "Building Solutions with Agile Product Delivery")
NEW QUESTION # 42
Which of the following is an activity for coaching flow?
- A. Facilitate Value Stream mapping
- B. Facilitate Value Stream & ART Identification
- C. Facilitate Strategic Themes creation
- D. Facilitate a SAFe Advanced Scrum Master training
Answer: A
Explanation:
Facilitating Value Stream mapping is a direct activity for coaching flow. Value Stream mapping helps teams and organizations visualize and understand their current process, identify bottlenecks, and find opportunities to improve flow and reduce waste, which is a key Lean practice advocated by SAFe.
References:
SAFe 6.0, "Accelerating Flow" and "Value Stream Mapping" articles
SPC 6.0 Guide, "Accelerating to Business Agility"
NEW QUESTION # 43
When does the System Demo happen?
- A. After the Solution Demo, but before PI Planning.
- B. After continuous integration.
- C. On demand.
- D. After Pre-PI Planning.
- E. After every Iteration.
Answer: E
NEW QUESTION # 44
What do Value Streams deliver?
- A. Cyber-physical systems
- B. Solutions
- C. Strategic Themes
- D. Agile Release Trains
Answer: B
Explanation:
Value Streams in SAFe deliver Solutions-the products, services, or systems that deliver value to the customer. Strategic Themes provide investment direction; ARTs and cyber-physical systems are structures or types of solutions, but not what value streams deliver.
"Value Streams deliver Solutions-products, services, or systems that deliver value to the customer." (Source: SAFe 6.0 Framework: Value Streams)
NEW QUESTION # 45
The teams on the ART just finished the second Iteration in the PI and have nothing to demonstrate at the System Demo. What steps should be taken next?
- A. Stop working on any new functionality and fully integrate and test the system; adjust scope based on learnings
- B. Continue to work on new functionality and reserve time to fully integrate the system during the IP Iteration.
- C. Require every team to demonstrate their team increment to the stakeholders separately in the team branch
- D. Re-architect the system so that there are no dependencies between the teams, and integration is not needed
Answer: A
Explanation:
SAFe recommends immediately integrating and testing the system when there is nothing to demonstrate, rather than continuing with new work. This helps surface integration issues early and allows for scope adjustment based on the learnings, supporting the principle of "integrating frequently" and "demonstrating working software." References:
SAFe 6.0, "System Demo" and "PI Execution" articles
SPC 6.0 Guide, "Coaching ART Execution"
NEW QUESTION # 46
A Scrum Master asked you to help her use systems thinking to identify the backlog items that would improve the system as a whole. Select one item that uses systems thinking most effectively.
- A. Involve representatives of department teams in Iteration Planning and Demos.
- B. Increase unit test coverage.
- C. Review the burn-down chart at each retrospective to improve team estimating.
- D. Make daily stand-ups more engaging and strictly timeboxed.
Answer: A
Explanation:
Systems thinking in SAFe focuses on optimizing the entire system, not just individual components. Involving representatives of department teams in planning and demos broadens feedback, uncovers cross-team dependencies, and improves flow across the system, rather than optimizing for one team.
References:
SAFe 6.0 Website: Systems Thinking
SPC 6.0 Guide: "Systems thinking encourages improvements that benefit the whole system."
NEW QUESTION # 47
Which of the following is a benefit of a community of practice?
- A. It reduces the need to have an ART Sync as often
- B. They provide an opportunity for managers to be kept up to date on progress
- C. They reduce work in process (WIP)
- D. They provide a forum for knowledge sharing
Answer: D
Explanation:
A community of practice (CoP) is a group of people who share a concern or passion for something they do and learn how to do it better as they interact regularly. In SAFe, CoPs provide a forum for knowledge sharing, foster continuous learning, and spread best practices across teams and the organization.
References:
SAFe 6.0, "Communities of Practice" article
SPC 6.0 Guide, "Establishing Team and Technical Agility"
NEW QUESTION # 48
What should a Supplier using a traditional methodology do when working with ARTs in a Value Stream?
- A. Attend key Value Stream events.
- B. Demonstrate working software at each Solution Demo.
- C. Develop her own Vision and Roadmap.
Answer: A
Explanation:
SAFe encourages Suppliers-even those using traditional methodologies-to collaborate closely with ARTs (Agile Release Trains) and the Solution Train. This is accomplished by participating in key Value Stream events such as PI Planning, Solution Demos, and Inspect and Adapt. This helps synchronize work, ensures alignment, and enables the Supplier's deliverables to integrate with the ART's outputs.
"Suppliers-regardless of their methods-are encouraged to participate in key Solution Train and ART events to ensure alignment and synchronization across the Value Stream." (Source: SAFe 6.0 Framework: Suppliers; SPC 6.0 Guide, "Building Solutions with Agile Product Delivery")
NEW QUESTION # 49
Understanding the full Value Stream allows you to focus on the delays.
- A. True
- B. False
Answer: A
Explanation:
SAFe 6.0 emphasizes that understanding the entire Value Stream is essential for identifying and addressing delays and inefficiencies. By visualizing the Value Stream, organizations can pinpoint where delays, bottlenecks, and waste occur, allowing them to focus improvement efforts precisely where they matter most.
"Mapping the Value Stream enables organizations to identify where the delays occur and focus on removing them, thus improving the flow of value to the customer." (Source: SAFe 6.0 SPC Guide, "Thriving in the Digital Age and Business Agility" module; Value Stream Mapping in the SAFe 6.0 framework.)
NEW QUESTION # 50
(Select 2) SAFe teams using Kanban are required to participate in which events?
- A. System Demo
- B. Iteration Planning
- C. Iteration Retrospective
- D. PI Planning
Answer: A,D
NEW QUESTION # 51
SAFe is a dual-operating system for Business Agility. What is one element of the dual-operating system?
- A. Value Stream Network
- B. Solution Context
- C. Agile Teams
- D. A Lean portfolio
Answer: A
Explanation:
SAFe 6.0 describes the dual-operating system as "combining the existing hierarchical structure with a second operating system that is organized around value streams and Agile Release Trains." The Value Stream Network is a key element of this dual-operating system, allowing organizations to deliver value quickly and efficiently while maintaining stability in their functional hierarchy.
References:
SAFe 6.0, "Business Agility" article
SPC 6.0 Study Guide, "Thriving in the Digital Age and Business Agility" section
NEW QUESTION # 52
(Select 3) What are typical Kanban classes of service for Agile Teams?
- A. Expedite
- B. Review
- C. Funnel
- D. Fixed date
- E. Accepted
- F. Standard
Answer: A,D,F
Explanation:
SAFe and Kanban both define classes of service as ways to handle work items based on urgency and business need. The typical Kanban classes of service are:
Fixed date (B): Items that must be completed by a specific deadline.
Expedite (C): Items that need to be done as soon as possible, jumping the queue.
Standard (D): Normal priority work items.
"Funnel," "Accepted," and "Review" are not classes of service; they refer to states or workflow stages.
"Typical Kanban classes of service for Agile teams include Standard, Fixed Date, and Expedite." (Source: SAFe 6.0 Framework: Team Kanban; SPC 6.0 Guide, "Building Solutions with Agile Product Delivery")
NEW QUESTION # 53
Who typically facilitates the ART Sync meeting?
- A. Agile coach
- B. Development manager or QA manager
- C. Release Train Engineer
- D. Value Stream Engineer
- E. Senior Scrum Master
Answer: D
NEW QUESTION # 54
(Select 2) What applies to the Portfolio Backlog?
- A. WSJF is used to prioritize Epics in the Portfolio Backlog.
- B. It provides a low-cost holding area for approved Business and Enabler Epics.
- C. Programs plan PIs so that they exhaust the Portfolio Backlog and only then work on their local
priorities. - D. The Portfolio Kanban holds Capabilities that are ready for implementation.
Answer: A,B
NEW QUESTION # 55
Which legacy practice slows the move to Lean Portfolio Management?
- A. Bringing the work to the people
- B. Centralized work intake
- C. Demand management
- D. Objective milestones
Answer: B
Explanation:
Centralized work intake is a legacy practice that creates bottlenecks, slows decision-making, and prevents decentralized, Lean governance. SAFe Lean Portfolio Management emphasizes decentralized decision- making and flow-based portfolio management; centralized work intake is specifically identified as a barrier to Lean portfolio flow.
References:
SAFe 6.0, "Lean Portfolio Management" and "Anti-Patterns"
SPC 6.0 Guide, "Exploring Lean Portfolio Management"
NEW QUESTION # 56
......
Valid SAFe-SPC Exam Dumps Ensure you a HIGH SCORE: https://pass4sure.actualtorrent.com/SAFe-SPC-exam-guide-torrent.html