[Feb-2023] Exam Sure Pass SAP Certification with C_IBP_2208 exam questions [Q31-Q46]

Share

[Feb-2023] Exam Sure Pass SAP Certification with C_IBP_2208 exam questions

Real SAP C_IBP_2208 Exam Questions Study Guide

NEW QUESTION 31
Which pre-processing steps can be used to cleanse historical sales data before generating a statistical forecast in SAP IBP?Note: There are 2 correct answers to this question.

  • A. Bias Detection and Correction in Sales History
  • B. Promotion Sales Lift Elimination
  • C. Substitute Missing with Mean or Median in Sales History
  • D. Intermittency Detection and Correction in Sales History

Answer: B,C

 

NEW QUESTION 32
You want to maintain key figure values for a new attribute and value combination, using SAP IBP, Add-in for Microsoft Excel, and are receiving an error related to missing combinations.How can you resolve this problem?Note: There are 2 correct answers to this question.

  • A. Use the option New Planning Object in the SAP IBP, add-in for Microsoft Excel
  • B. Use the Check Mode operator to create the combinations
  • C. Use the Data Integration app to load suitable data that creates the combinations
  • D. Use the Manage Master Data app to create the combinations

Answer: C,D

 

NEW QUESTION 33
You need to define a new logic for a key figure to drive values from the PERPRODCUSTREGION level to the PERPRODCUST level.Which of the following configuration options are possible for this process?Note: There are 2 correct answers to this question.

  • A. Splitting the values from detailed to aggregated level by using a copy operator
  • B. Splitting the values from aggregated to detailed level, based on the time profile attribute
  • C. Splitting the values from aggregated to detailed level, based on a stored split-factor key figure
  • D. Splitting the values from aggregated to detailed level using multiplication by the proportions

Answer: C,D

 

NEW QUESTION 34
Which parts of the S&OP high-level process would the Inventory planning and optimization process fit into?Note: There are 2 correct answers to this question.

  • A. Supply Review, by providing an input to supply network planning
  • B. Reconciliation Review, by providing inventory parameters for one consolidated plan
  • C. Management business Review, by providing the inventory targets for endorsement
  • D. Demand Review, by using the output of demand planning as input into calculations

Answer: B,C

 

NEW QUESTION 35
What are some of the available ABC segmentation methods in SAP IBP?Note: There are 2 correct answers to this question.

  • A. By Pareto Principle (Sorted and Calculated Values)
  • B. By Number of Items (Sorted Values)
  • C. By Pareto Principle (Sorted and Cumulated %)
  • D. By Number of Items (Sorted Average)

Answer: A,B

 

NEW QUESTION 36
Which applications are present in the sample model SAPIBP1?Note: There are 3 correct answers to this question.

  • A. Response Planning
  • B. Inventory Optimization
  • C. Demand Sensing
  • D. Demand Driven Replenishment
  • E. Sales and Operations Planning

Answer: B,C,E

 

NEW QUESTION 37
How many different time levels can be selected within one planning view?

  • A. Only time levels from the base planning level of selected key figures
  • B. All time levels available in the time profile, restricted by global configuration parameter
  • C. All time levels available in the time profile
  • D. Only base time levels of the planning area

Answer: C

 

NEW QUESTION 38
What are the outputs of the Calculate Target Inventory Components Operator?Note: There are 3 correct answers to this question.

  • A. Reorder Point
  • B. Target Cycle Stock
  • C. Component Usage
  • D. Recommended Safety Stock
  • E. Target Pipeline Stock

Answer: B,D,E

 

NEW QUESTION 39
What is a prerequisite for modeling outsourced manufacturers with production capacity using the Supply Optimizer?

  • A. Use production lead times and offsets to manage components at the outsourced manufacturing location
  • B. Model relative production costs across internal locations and outsourced manufacturing locations
  • C. Model target inventory and stocks at the outsourced manufacturing location
  • D. Ensure that the outsourced manufacturing locations have a separate subnetwork

Answer: B

 

NEW QUESTION 40
Which SAP IBP planning operator can be run to delete planning objects in a certain version?

  • A. Purge Key Figure Data
  • B. Purge Non-Confirming Data
  • C. Purge Master Data
  • D. Purge Key Figure Data Outside Planning Area Planning Horizon

Answer: A

 

NEW QUESTION 41
Using the import/export functionality means working with groups of items that are organized into collections.What is the best practice for managing collections?

  • A. A planning area with its time profile must be bundled in one collection.
  • B. Configuration items should be bundled in the collections based on the SAP IBP project stream.
  • C. You should delete collections after they have been transported.
  • D. A planning area with the copy operators assigned must be bundled in one collection.

Answer: A,D

 

NEW QUESTION 42
Which of the following data can be tracked using a change-history-enabled key figure?Note: There are 3 correct answers to this question.

  • A. Scenario ID
  • B. Attributes
  • C. Reason code
  • D. Key figure type
  • E. Modified date

Answer: B,C,E

 

NEW QUESTION 43
You need to use your resource cost effectively with a certain minimum use, even if it means producing more than demand.Which solutions would apply to this scenario?Note: There are 2 correct answers to this question.

  • A. Balance can be achieved between excessive prebuild and minimum use by incorporating violation costs.
  • B. Excess stock can be generated and will need to be staged in an overflow warehouse.
  • C. Capacity leveling will be possible for production and storage resources.
  • D. Minimum capacity utilization will result in pull production occurring.

Answer: A,B

 

NEW QUESTION 44
You have set up a planning area, and data is now available. You adjust the necessary time profile settings and run a consistency check.Which settings can you change and still run a successful consistency check?Note: There are 2 correct answers to this question.

  • A. Change the past and future horizon of the levels in the time profile.
  • B. Change the numbering hierarchy of the period IDs in the time profile.
  • C. Change the description of the attributes in the time profile.
  • D. Add a new time profile level to the time profile.

Answer: A,C

 

NEW QUESTION 45
You are configuring disaggregation for the KF1 key figure in the Planning Areas Model Configuration app.Which methods can you use?Note: There are 3 correct answers to this question.

  • A. Disaggregation according to a helper key figure
  • B. Disaggregation according to a user-defined expression
  • C. Disaggregation in batch triggered by an application job
  • D. Disaggregation according to an equal split
  • E. Proportional disaggregation by using KF2 in the expression

Answer: B,D,E

 

NEW QUESTION 46
......

Updated and Accurate C_IBP_2208 Questions for passing the exam Quickly: https://pass4sure.actualtorrent.com/C_IBP_2208-exam-guide-torrent.html